P. Stradins Hospital new block is the most extensive and expensive project in Latvian medicine in recent years. In the round 1 of the block construction, three blocks have been built: first (A1), second (A2) and sixth (A6). As the construction continues, the third (A3), fourth (A4), fifth (A5), seventh (A7) and eighth (A8 )block will also be built. Total built area is 30,438 square metres.
Within this project Thermowhite team performed coating of floor sound/thermal insulation system Thermowhite (WD 100R + PE 5/300) and filling of the monolithic sections with Thermowhite WD 100R.